Capabilities

Established supplier with significant experience supplying the sector

  • Pre-Construction Development Phase (DEVEX): Seabed Bethnic Surveys
  • Pre-Construction Development Phase (DEVEX): Geophysical Surveys
  • Pre-Construction Development Phase (DEVEX): Geotech Surveys
  • Pre-Construction Development Phase (DEVEX): Survey Vessels
  • Pre-Construction Development Phase (DEVEX): Met Mast Survey & Inspection
  • Pre-Construction Development Phase (DEVEX): Access Vessels
  • Pre-Construction Development Phase (DEVEX): UXO Management
  • DEVEX - Project Management & QA Services: Project Management & Programme Management
  • DEVEX - Project Management & QA Services: Health & Safety Services
  • DEVEX - Project Management & QA Services: Health & Safety Training
  • DEVEX - Project Management & QA Services: Communications & PR
  • DEVEX - Project Management & QA Services: Asset Management and Inventory Control
  • CAPEX - Turbine Services: Shoreside Lifting Services
  • CAPEX - Balance of Plant - Manufacture / Supply Services: Port facilities for Construction Support Vessels including Cable Lay vessels
  • CAPEX - Balance of Plant - Manufacture / Supply Services: Electrical system including backup generator, switchgear, transformers & converters
  • CAPEX - Balance of Plant - Manufacture / Supply Services: Electrical system including backup generator, switchgear, transformers & converters
  • CAPEX - Balance of Plant - Manufacture / Supply Services: Buildings & other facilities management & security
  • CAPEX - Balance of Plant - Manufacture / Supply Services: Back Up Generators & Fuel Supply
  • CAPEX - Balance of Plant - Manufacture / Supply Services: Accommodation & Transport Services
  • CAPEX - Balance of Plant - Manufacture / Supply Services: Port Logistics for CSV including Victualing
  • CAPEX - Balance of Plant - Manufacture / Supply Services: General Lay Down Areas & Installation Support Services
  • CAPEX - Balance of Plant - Manufacture / Supply Services: Offshore Equipment Services
  • CAPEX - Balance of Plant - Manufacture / Supply Services: Offshore Labour Services
  • CAPEX - Balance of Plant - Manufacture / Supply Services: Marine Coordination or Shipping Services
  • CAPEX - Balance of Plant - Manufacture / Supply Services: Vessels or Vessel Equipment Provision
  • OPEX - Operations & Maintenance: O&M Port and Logistics
  • OPEX - Operations & Maintenance: Marine Operations
  • OPEX - Operations & Maintenance: Onshore Accommodation & Transport services
  • OPEX - Operations & Maintenance: Storage of Strategic Spares/Lay Down Areas
  • OPEX - Operations & Maintenance: Workboats & Helicopter services
  • OPEX - Operations & Maintenance: Vessel repairs and liftout services
  • OPEX - Operations & Maintenance: Fuel & Consumables
  • OPEX - Operations & Maintenance: Offshore Logistics including Accommodation / Base
  • OPEX - Operations & Maintenance: Turbine Maintenance & spare parts
  • OPEX - Operations & Maintenance: Wind turbine blade access, Inspection & Repair
  • OPEX - Operations & Maintenance: Offshore substation maintenance
  • OPEX - Operations & Maintenance: Export & Array cable Surveys & Repairs
  • OPEX - Operations & Maintenance: Onshore Electrical
  • OPEX - Operations & Maintenance: Scour & Structural Surveys & Repairs
  • OPEX - Operations & Maintenance: Lifting, climbing & safety equipment & inspections
  • OPEX - Operations & Maintenance: Training & provision of technicians to carry out BoP maintenance
  • OPEX - Operations & Maintenance: Training & provision of wind turbine electricians
  • OPEX - Operations & Maintenance: Testing and Certifications
  • Decommissioning: Documentation
  • Decommissioning: Decommissioning

Good capacity and some experience in supplying the sector

  • Pre-Construction Development Phase (DEVEX): Onshore Surveys

Ambitions to diversify in the sector

  • Pre-Construction Development Phase (DEVEX): Front End Engineering & Design Studies

Case studies

Beatrice Offshore Windfarm began construction in the spring of 2017 with the installation of 84 foundations to support the Siemens Gamesa turbines, 13 km from the Caithness coastline. Working with the Tier One Contractor responsible for the construction and installation of the jacket foundations, Rix Shipping initially provided 1 Crew Transfer Vessel (CTV), the Rix Lynx, to support the transportation of up to 24 personnel from the heavy lift vessels to the transportation barges carrying the jackets and around the site.

Contract type: Provision of Crew Transfer Vessels from Wick Rix Shipping

Value: €4.1 million

This support increased to having 3 CTVs on site during the summer campaigns of 2018 and 2019 based at the Operations & Maintenance base of Wick, with the Rix Lion, Rix Cheetah and Rix Lynx providing versatile support transporting personnel and equipment from the base port to offshore allow a thorough snagging regime to take place prior to the handover of the foundations to the site team. To support this work the vessels provided a platform to supply power and high pressure washing facilities to allow painting activities.

Rix Renewables was asked to provide technicians to carry out the annual service and statutory inspections of the HMF nacelle cranes, litfkets and fire extinguishers, on all 19 of the sites Siemens SWT-1.3-62 wind turbines.

Contract type: Annual inspections

Value: £14,000

Rix Renewables supplied a team of HMF trained crane engineers and statutory inspectors to carry out the campaign of works. All inspections were carried out in line with LOLER regulations and working alongside the clients own technicians the works were completed with minimal disruption to turbine availability.

 