Powering Scotland’s East Coast

Partners' opportunities

TWD

Business type: Engineering

Contact: Ross Gordon, Business Developer
Address: 310 Metropolitan Wharf, 70 Wapping Wall, London E1W 3SS
Email:
Countries worked in: United Kingdom, Netherlands (HQ), Greece, Taiwan, Japan, Australia

TWD is an engineering company specialized in method engineering and equipment design. By continuously developing our expertise, we strive to help you safely build your projects on time and within budget. Problem-solving, dedication, and teamwork are in our DNA, through which we deliver you the fit-for-purpose engineering solutions for your transport, installation, and construction projects.

Thanks to our multidisciplinary engineering teams, we are experts in tackling your market-specific challenges. We deliver state-of-the-art solutions by combining method engineering and equipment design. This has strongly positioned us in the markets of Offshore Wind, Heavy Lift and Transportation, Heavy Civils, and Vessel Outfitting. Our creative, flexible, and cost-effective approach makes us the perfect partner for your next engineering project.

With 15+ years of industry expertise, TWD has a proven track records in Offshore Wind and Marine Civils.

Looking to connect with: Engineering; Electrical; Materials; Marine; Logistics; Developers, Contractors, OEM, Port Operators, Vessel owners
Type of work: Method Engineering & Equipment Design for Offshore Wind, Heavy Lift and Transportation, Heavy Civils, and Vessel Outfitting.

Case studies

DEME’s Monopile Installation Vessel Orion is the newest member of its fleet. The Orion is tasked with the record-breaking installation of 29 XXL monopiles for the Arcadis Ost 1 Offshore Wind Farm in the German Baltic Sea. With the largest piles sitting at 110m long, 9.5m in diameter, and 2,000 tonnes, the Orion required an innovative approach to tackle these behemoths. TWD developed the basic structural and mechanical design of a motion compensated pile gripper (MCPG).

Contract type: Design & Engineering

Value: N/A

Our motion-control engineers performed extensive dynamic simulations and validated those in scaled tank tests, leading to a detailed specification of Orion’s gripper and its robust installation method on DP. Based on the simulations, scale tests and results, DEME has seen these results and principals as a confirmation of their business case and contracted Huisman for designing and building a MCPG. TWD’s support continued with detailed analyses of the interaction between the vessel’s Dynamic Positioning system, the crane and MCPG, which over the last weeks resulted in the safe and stable installation of Orion’s first monopiles on DP. Project highlights - Future proof MP seafastening system for up to 5 MPs - Robust lifting tool stabbing system to decrease time offshore

TWD assisted OW Ocean Winds with the transport of 48 XXL monopiles to the Port of Nigg for the Moray West Offshore Wind Farm project. TWD was delighted to support OW Ocean Winds with our smart seafastening cradle design. Our universal seafastening cradles, designed for efficient loading and unloading operations utilising SPMTs without the need for cranes. Moreover, these cradles can accommodate monopiles of different diameters. The smart seafastening cradle design ensured safe, efficient, and sustainable transoceanic transportation.

Contract type: Design & Engineering

Value: N/A

Curious about how we can help you with your next project? Reach out, and let us show you how.

 

Back to listings

Update your listing

If you are already registered and would like to update details on your listing, click here to sign in and make changes.

Loading